Performed work in 2023
WWTP 42 000 m3
/day. ![]() |
WWTP 42 000 m3
/day. ![]() |
Microfilter 1600 m3/day. Supply.
![]() |
![]() |
Pressurizationsystem for flotation unit 150 m3/h. ![]() |
Control cabinet for flotation unit 150 m3/hour. ![]() |
WWTP 7200 m3/day. Completion of construction works
![]() |
![]() |
![]() |
![]() |
WWTP 7200 m3/day. Installation of irrigation biofilters
![]() |
![]() |
WWTP 7200 m3/day. Installation of ventilation system ![]() |
WWTP 7200 m3/day. Installation of aeration system ![]() |
Screw conveyor-compactor ![]() |
WWTP 7200 m3/day. Start of electrical installation works
![]() |
![]() |
WWTP 7200 m3/day. ![]() |
WWTP 7200 m3/day. ![]() |
Preparation for installation of TOYO sand pumps
![]() |
![]() |
WWTP 7200 m3/day.
Installation of flotation units 150 m3/h
![]() |
![]() |
WWTP 7200 m3/day.
Installation of flotation units 10 m3/hour
![]() |
![]() |
Group of channel fine screen with a capacity of 10,000 m3/h
![]() |
![]() |
Installation and piping of irrigation ![]() |
Installation of polymer pumps is completed ![]() |
WWTP 7200 m3/day. Installation of sand traps completed
![]() |
![]() |
![]() |
![]() |
Loading of irrigation biofilters
![]() |
![]() |
WWTP 7200 m3/day. Hydraulic tests of irrigation and flow biofilters
![]() |
![]() |
Starting up the flotation feed pumps and dosing pumps
![]() |
![]() |
WWTP 7200 m3/day. Comissioning flotator 2x150 m3/hour
Commissioning of flow biofilters (2 lines)
![]() |
![]() |
![]() |
![]() |
Commissioning of the sludge dewatering system
![]() |
![]() |
WWTP 7200 m3/day.
Setting up a control system with remote monitoring
![]() |
![]() |
![]() |
![]() |