Performed work in 2023

JANUARY 2023

WWTP 42 000 m3 /day.
Primary sedimentation tank sludge scraper

WWTP installation

WWTP 42 000 m3 /day.
Primary sedimentation tank sludge scraper

Primary sedimentation tank sludge scraper


FEBRUARY 2023


Microfilter 1600 m3/day. Supply.

Microfilter Microfilter installation

Pressurizationsystem for flotation unit 150 m3/h.

Pressurization system for flotation unit

Control cabinet for flotation unit 150 m3/hour.

Control cabinet for flotation unit


MARCH 2023


WWTP 7200 m3/day. Completion of construction works

WWTP installation WWTP order

WWTP construction WWTP photo


APRIL 2023


WWTP 7200 m3/day. Installation of irrigation biofilters

WWTP order Installation of irrigation biofilters

WWTP 7200 m3/day. Installation of ventilation system

Installation of ventilation system


MAY 2023

WWTP 7200 m3/day. Installation of aeration system

Aeration system installation

Screw conveyor-compactor

Screw conveyor-compactor


JUNE 2023


WWTP 7200 m3/day. Start of electrical installation works

WWTP project Electrical installation works


JULY 2023

WWTP 7200 m3/day.
Screw deatering filter press MYD-303.
Preparation for installation

Screw dehydrator MYD-303

WWTP 7200 m3/day.
Installation of blowers and air ducts

Installation of blowers and air ducts


Preparation for installation of TOYO sand pumps

Preparation for installation of TOYO sand pumps Installation of TOYO sand pumps


AUGUST 2023


WWTP 7200 m3/day.
Installation of flotation units 150 m3/h

Installation of flotation units Order installation of flotation units


WWTP 7200 m3/day.
Installation of flotation units 10 m3/hour

Installation of flotation unit Flotation unit installation photo


Group of channel fine screen with a capacity of 10,000 m3/h

Channel screens Installation of channel screens


SEPTEMBER 2023

Installation and piping of irrigation
biofilter pumps completed

Installation and piping of irrigation biofilter pumps

Installation of polymer pumps is completed

Installation of polymer pumps


WWTP 7200 m3/day. Installation of sand traps completed

WWTP installation Installation of sand traps


WWTP 7200 m3/day.
Commissioning of drum screens with a total
capacity of 4000 m3/hour.

Commissioning of drum screens


WWTP 7200 m3/day.
Preparation for installation of pumps with a capacity
of 360 m3/h and emergency technical water

Pump installation


OCTOBER 2023


Loading of irrigation biofilters

Irrigation biofilters Loading of irrigation biofilters


WWTP 7200 m3/day. Hydraulic tests of irrigation and flow biofilters

Hydraulic tests of biofilters Testing of biofilters


Starting up the flotation feed pumps and dosing pumps

Starting feed pumps Pump startup


NOVEMBER 2023


WWTP 7200 m3/day. Comissioning flotator 2x150 m3/hour
Commissioning of flow biofilters (2 lines)

Commissioning of flotation units WWTP installation

WWTP photo WWTP work execution


Commissioning of the sludge dewatering system

Sludge dewatering system Sludge dewatering


DECEMBER 2023


WWTP 7200 m3/day.
Setting up a control system with remote monitoring

WWTP control systems WWTP installation


Blowing of flow-through biofilters with a
capacity of 7200 m3/day

Blowing of flow-through biofilters


Containerized sludge dewatering module with
dewatering filter press MYD-201

MYD-201