January 2020
Installation of rotary screen FLOKFIL MS 63/120
Preparation for production of screw dewatering filter presses MYD 101 and MYD 201
![]() |
![]() |
February 2020
Manufacturing of a 50 m3/day membrane module based on Mitsubishi Chemical membrane elements
![]() |
![]() |
Service work on replacing screw units of the Amcon ES 353 dewatering filter press
(operation time 8 years around the clock)
![]() |
![]() |
March 2020
Installation of rotary screen FLOKFIL MS 40/25
Maintenance of a membrane module with a capacity of 200 m3/day based on Mitsubishi Chemical membrane elements
![]() |
![]() |
![]() |
April 2020
Audit of WWTPs that was built in 2007 for the purpose of reconstruction with an increase in productivity to 280 m3/day
![]() |
![]() |
Installation of WWTP pre-treatment equipment with a capacity of 200 m3/day
![]() |
![]() |
May 2020
Inspection of channel gratings after 3 years of operation
![]() |
![]() |
June 2020
Reconstruction of WWTP with a capacity of 200 m3/day
![]() |
![]() |
July 2020
Reconstruction of WWTP with MBR with capacity increase up to 15 m3/day
![]() |
![]() |
![]() |
![]() |
Sand separator FLOKFIL 40 m3
August 2020
Bioplato installation work
![]() |
![]() |
![]() |
![]() |
September 2020
Installation of rotary screen TR 40/25 and aeration system
![]() |
![]() |
October 2020
Manufacturing of a combi-plant with a capacity of 120 m3/h
![]() |
![]() |
Shipment of rotary screen FLOKFIL MS 63/120 and polymer station Poli 1000
![]() |
![]() |
November 2020
Polymer station Poli-500
Rotary screen FLOKFIL MS 40/25 - production, shipment
![]() |
![]() |
![]() | ![]() |
Final assembly of a combi-plant with a capacity of 120 m3/h
December 2020
Shipment of a combi-plant with a capacity of 120 m3/h
![]() |
![]() |
![]() |
![]() |
Installation work of local treatment plants before wastewater treatment of a dairy plant with a capacity of 500 m3/day
![]() |
![]() |