January 2018
The end of installation work of the equipment of mechanical and physico-chemical cleaning of the confectionery factory.
![]()  | 
![]()  | 

February 2018 
Installation and commissioning at the confectionery factory.
![]()  | 
![]()  | 
March 2018
Polymer station 500 l / h

April 2018 
Production of  Rotary screen 40/75. Production of FLOT - 20. 
Installation work at the production of egg powder plant.
![]()  | 
![]()  | 
![]()  | 
![]()  | 
May 2018 
Installation work of flotation equipment FLOT - 20. 
Installation of aeration system at the treatment facilities of the recreation center, with a capacity of 450 m3 / day
![]()  | 
![]()  | 
![]()  | 
![]()  | 
June 2018
Installation work at the sewage treatment plant of the egg powder production plant
Adjustment work at the treatment facilities of the recreation center, with a productivity of 450 m3 / day
![]()  | 
![]()  | 
![]()  | 
![]()  | 

July 2018
Adjustment work at the treatment facilities of the recreation center, with a productivity of 450 m3 / day
Adjustment work at the sewage treatment plant of the egg powder production enterprise
![]()  | 
![]()  | 
![]()  | 
![]()  | 

August 2018 
Installation of the MYDL-302 dehydrator and accessories.
Adjustment work at the sewage treatment plant of the egg powder production enterprise
![]()  | 
![]()  | 
![]()  | 
![]()  | 
November 2018 
Production of the flotator FLOT - 30 is started.
![]()  | 
![]()  | 

December 2018 
The end of  production of the FLOT-10 for the PE bottle recycling workshop in Flex.
![]()  | 
![]()  | 