Performed work in 2018
January 2018
The end of installation work of the equipment of mechanical and physico-chemical cleaning of the confectionery factory.
February 2018
Installation and commissioning at the confectionery factory.
March 2018
Polymer station 500 l / h
April 2018
Production of Rotary screen 40/75. Production of FLOT - 20.
Installation work at the production of egg powder plant.
May 2018
Installation work of flotation equipment FLOT - 20.
Installation of aeration system at the treatment facilities of the recreation center, with a capacity of 450 m3 / day
June 2018
Installation work at the sewage treatment plant of the egg powder production plant
Adjustment work at the treatment facilities of the recreation center, with a productivity of 450 m3 / day
July 2018
Adjustment work at the treatment facilities of the recreation center, with a productivity of 450 m3 / day
Adjustment work at the sewage treatment plant of the egg powder production enterprise
August 2018
Installation of the MYDL-302 dehydrator and accessories.
Adjustment work at the sewage treatment plant of the egg powder production enterprise
November 2018
Production of the flotator FLOT - 30 is started.
December 2018
The end of production of the FLOT-10 for the PE bottle recycling workshop in Flex.