Performed work in 2017
January 2017
Covering the biofilters of a confectionery factory with a capacity of 450 m3 / day
Removal of the pen from the waste water of a poultry farm on a drum screen. Setting works.
February 2017
Reconstruction of biological treatment plants of 800 m3 / day. The beginning of Civil works.
Reconstruction of biological treatment facilities 800 m3 / day. The beginning of Installation works.
March 2017
Set-up works of biological WWTP at the meat-packing plant
Shipment of air blowers for biological treatment plants of 800 m3 / day
April 2017
Dewatering press 201. Completion of assembly, preparation for shipment.
Set-up works of treatment facilities of the village 800 m3 / day
Commissioning works on the drum screen in the tanning industry
May 2017
The start of dewatering system of flotation foam at the meat-packing plant, dry solids- 40 kg / hr
The start of operation of the Water treatment plants of container type of 25 m3 / day. Beach area, sports complex.
September 2017
The manufacture of grease separator is completed. Equipment put into operation
October 2017
Installation works of the equipment of treatment plants and pipelines of the confectionery factory.
Productivity is 400 m3 / day.
November 2017
Installation works of the equipment of treatment plants and pipelines of the confectionery factory.
The productivity is 100 m3 / day.
December 2017
Manufacturing of dewatering filter presses of 201 and 402 series