Performed work in 2017

January 2017

Covering the biofilters of a confectionery factory with a capacity of 450 m3 / day

Removal of the pen from the waste water of a poultry farm on a drum screen. Setting works.


design of erection of buildings 
design of erection of buildings


design of erection of buildings 
design of erection of buildings


February 2017

Reconstruction of biological treatment plants of 800 m3 / day. The beginning of Civil works.

Reconstruction of biological treatment facilities 800 m3 / day. The beginning of Installation works.


design of erection of buildings 
design of erection of buildings


design of erection of buildings 
design of erection of buildings


March 2017

Set-up works of biological WWTP  at the  meat-packing plant

Shipment of air blowers for biological treatment plants of 800 m3 / day


design of erection of buildings 
design of erection of buildings


design of erection of buildings 
design of erection of buildings


April 2017

Dewatering press 201. Completion of assembly, preparation for shipment.

Set-up works of treatment facilities of the village 800 m3 / day

Commissioning works on the drum screen in the tanning industry


design of erection of buildings 
design of erection of buildings


design of erection of buildings 
design of erection of buildings


design of erection of buildings 
design of erection of buildings


design of erection of buildings 
design of erection of buildings


May 2017

The start of dewatering system of flotation foam at the meat-packing plant, dry solids- 40 kg / hr

The start of operation of the Water treatment plants of  container type  of 25 m3 / day. Beach area, sports complex.


design of erection of buildings 
design of erection of buildings


design of erection of buildings 
design of erection of buildings


design of erection of buildings 
design of erection of buildings


design of erection of buildings


September 2017

The manufacture of grease separator is completed. Equipment put into operation


design of erection of buildings 
design of erection of buildings


October 2017

Installation works of the equipment of treatment plants and pipelines of the confectionery factory.
Productivity is 400 m3 / day.


design of erection of buildings 
design of erection of buildings


design of erection of buildings 
design of erection of buildings


design of erection of buildings 
design of erection of buildings


November 2017

Installation works of the equipment of treatment plants and pipelines of the confectionery factory.

The productivity is 100 m3 / day.


design of erection of buildings 
design of erection of buildings


December 2017

Manufacturing of dewatering filter presses of 201 and 402 series


design of erection of buildings 
design of erection of buildings


design of erection of buildings 
design of erection of buildings