Performed work in 2019
January 2019
Rotary screen TR 40/50 installation
February 2019
Production of a mechanized grease trap with a capacity of 10 m3 / hour.
Site preparation for installation of FLOT - 30. Installation of FLOT - 30.
March 2019
Installation of the FLOT – 10. Flotation complex for wastewater treatment and ensuring the reverse cycle of
washing PET bottles and producing PET flex.
April 2019
Production of a sand separator with a capacity of 20 m3 / hour.
Production of the membrane module 50 m3 / day.
May 2019
Installation of the FLOT - 10 flotation complex for wastewater treatment and ensuring the reverse cycle of washing PET bottles and producing of PET flex.
Rotary screen operation for FLEX removal.
Waste from rotary screen.
Screw feeder with agitator.
June 2019
Commissioning of FLOT - 30.
July 2019
Production of a sand separator with a capacity of 40 m3/day.
Shipment of treatment plant equipment for the dairy.
August 2019
Installation of the flotator FRC - 30. Installation of POLI - 1000.
September 2019
Installation of equipment and pipelines at treatment facilities for a dairy plant with a capacity of 450 m3 / day.
October 2019
Dairy flotation adjustment 450 m3 / day. Exit from flotation. Flot’s foam.
November 2019
Setting up of the MYDL - 301 dewatering filter-press at the dairy.
Service work on replacing the screw assembly and moving rings of the ES-353 screw dehydrator
Operating time before replacement was 7 years.
December 2019
Installation of the WWTP of the poultry farm 350 m3 / day.