Chief-installation of MBR at the candy factory. Productivity is 600 m3 / day.
-
November, 2013
Commissioning works of WWTP at milk and meat plant are completed.
-
October, 2013
Installation works of belt filter press are completed.
-
September, 2013
Commissioning of WWTP for gantry car wash with reverse water supply is completed. Productivity is 16 m3/day.
-
August, 2013
Installation works of WWTP and disinfection of infectious hospital are completed. Productivity is 30 m3 / day.
-
July, 2013
Comissioning works of the flotator and accessories are completed at pig complex. Productivity is 40 m3/per day.
-
June, 2013
Commissioning of WWTP at sunflower seeds processing plant is completed.
-
May, 2013
At the final stage are works of installation of domestic wastewater plants with productivity 70 m3/ day. Installation of Bioplato, commissioning.
-
April, 2013
Сommissioning of pre-treatment WWTP and sludge dewatering equipment.
-
March, 2013
The chief-installation works of the flotation equipment.