Performed work in 2016
December 2015 - March 2016
Start of own water treatment equipment production
April 2016
Shipment of the Kubicek air blower, 160 Kw
Preparation for shipment of the MYDL-132 dewatering filter press
May 2016
Installation work. Confectionery factory. WWTP of 480 m3 / day
Filling of the base plate for container treatment plants of 25 m3 / day
June 2016
Commissioning of the dewatering system with a capacity of 420 kg d.s. / hour
Commissioning works at Confectionery factory, WWTP - 480 m3 / day
July 2016
Preparation of an averager for the installation of a barbotage system for mixing (poultry farm)
Installation of the barbotage system of the reservoir of the averager (poultry farm)
August 2016
Service work at the confectionery plant
November 2016
Manufacturing of container treatment plants of 25 m3 / day
December 2016
Installation works of biological wastewater treatment plants of a meat-packing plant