December 2015 - March 2016
Start of own water treatment equipment production
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
April 2016
Shipment of the Kubicek air blower, 160 Kw
Preparation for shipment of the MYDL-132 dewatering filter press
![]() |
![]() |
May 2016
Installation work. Confectionery factory. WWTP of 480 m3 / day
Filling of the base plate for container treatment plants of 25 m3 / day
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
June 2016
Commissioning of the dewatering system with a capacity of 420 kg d.s. / hour
Commissioning works at Confectionery factory, WWTP - 480 m3 / day
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
July 2016
Preparation of an averager for the installation of a barbotage system for mixing (poultry farm)
Installation of the barbotage system of the reservoir of the averager (poultry farm)
![]() |
![]() |
![]() |
![]() |
![]() |
August 2016
Service work at the confectionery plant
![]() |
![]() |
![]() |
![]() |
![]() |
![]() |
November 2016
Manufacturing of container treatment plants of 25 m3 / day
![]() |
![]() |
![]() |
December 2016
Installation works of biological wastewater treatment plants of a meat-packing plant